Functioning
Function: When the nail anchor is loaded, the anchor bolt pulls into the expansion clip and expands it against the borehole wall
Installation: The Upat Nail Anchor UNA is installed in the through-hole assembly. Set the borehole, clean it, then drive in the nail anchor - done
Tools: Drill, drill machine, blower (UPM AB), hammer